Septic tank mold
You need to consider the site first. The factory condition is the lifeline foundation of the brick factory. A good geographical location can drive the entire economic cycle. A good brick factory location should consider factors such as freight, water sources, and the environment. A large-scale venue can not only sell smoothly, but also carry out work such as importing and exporting raw materials more smoothly. In terms of management within the factory, it is necessary to discuss with the team the sales direction of bricks and the proportion of raw materials for brick production, etc. These are all indispensable links in running a brick factory.
The one-step positioning of septic tank molds must be based on the scale of the production line. The production line must include automatic loading, brick making, automatic entry and exit of the board, and a stacker and brick stacking truck. The placement of various raw materials in the site must also be Need to be well coordinated. At the very least, the safe placement of special paints such as cement must be ensured within the venue. Not to mention the warehouse, at the very least, an open shed must be constructed and covered with plastic film.
Septic Tank Mold/Septic Tank Steel Mold Distribution